Supply Date05 Apr 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity45.8
Freight20
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-24.6773799126
Quality Deviance0
Grade Deviance0
Total Cost3495.58
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.81
Fe7.96
SiO217.64
Al2O38.12
P0.114
Size 0-10MM6.42
Size 10-20MM16.24
Size 20-100MM58.78
Size +100MM18.56
MOISTURE2.59