Supply Date27 Sep 2024
Contract NumberSAFAL/P/MANGANESE ORE/09/2024/72
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)High (44% - 50%)
Lot NumberAkhand Mn 48-50%
Deviance0
Inward Quantity47.04
Freight0
Loading Charges0
Offloading Charges-12
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4751.04
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.63
Fe6.59
SiO214.56
Al2O35.28
P0.134
Size 0-10MM7.24
Size 10-20MM19.30
Size 20-100MM55.31
Size +100MM18.15
MOISTURE1.38