Supply Date05 Jun 2024
Contract NumberSAFAL/P/MANGANESE ORE/05/2024/52
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDINGCHENG MEDIUM GRADE MN ORE-FY 2024
Deviance0
Inward Quantity50.82
Freight17.537
Loading Charges0.764
Offloading Charges0
Royalty4.7645
Other Cost20.3009067297
Quality Deviance0
Grade Deviance0
Total Cost6828.5
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.63
Fe2.08
SiO25.42
Al2O32.76
P0.116
Size 0-10MM3.84
Size 10-20MM2.53
Size 20-100MM43.24
Size +100MM50.39
MOISTURE1.67