Supply Date03 Jun 2024
Contract NumberSAFAL/P/MANGANESE ORE/05/2024/47
ItemManganese Ore
Supplier NameJONATHAN NGANDWE
Grade (%)Medium (38% - 44%)
Lot NumberJONATHAN NGANDWE KAWAMBWA MATERIAL FY 2024
Deviance0
Inward Quantity39.16
Freight30.93784201
Loading Charges0
Offloading Charges-3.86721144024
Royalty4.70072
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2797.73
Conversion Rate (Please insert 1 if no conversion is required)25.8583
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.10
Fe2.81
SiO219.85
Al2O36.69
P0.253
Size 0-10MM24.58
Size 10-20MM11.23
Size 20-100MM45.36
Size +100MM18.83
MOISTURE2.12