Supply Date28 May 2024
Contract NumberSAFAL/P/MANGANESE ORE/05/2024/47
ItemManganese Ore
Supplier NameJONATHAN NGANDWE
Grade (%)Medium (38% - 44%)
Lot NumberJONATHAN NGANDWE KAWAMBWA MATERIAL FY 2024
Deviance0
Inward Quantity45.9
Freight29.7645
Loading Charges0
Offloading Charges0
Royalty4.80161
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3340.22
Conversion Rate (Please insert 1 if no conversion is required)26.8777
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.64
Fe3.55
SiO211.12
Al2O36.18
P0.204
Size 0-10MM4.23
Size 10-20MM15.84
Size 20-100MM59.72
Size +100MM20.21
MOISTURE2.12