Supply Date02 May 2024
Contract NumberSAFAL/P/MANGANESE ORE/04/2024/34
ItemManganese Ore
Supplier NameVICTOR ZAMUNDA ZAMROCK INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberVICTOR ZAMROCK INVESTMENT LTD
Deviance0
Inward Quantity29.4
Freight10.24056
Loading Charges0
Offloading Charges0
Royalty5.196555
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1468.58
Conversion Rate (Please insert 1 if no conversion is required)26.854
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.18
Fe2.07
SiO210.4
Al2O38.97
P0.193
Size 0-10MM13.38
Size 10-20MM38.68
Size 20-100MM24.14
Size +100MM23.80
MOISTURE1.02