SAFAL/P/MN ORE/06.80A/2020
| Contract Number | SAFAL/P/MN ORE/06.80A/2020 |
| Contract Date | 01 Sep 2020 |
| Type | Purchase |
| Supplier Name | Robbie Evans |
| Description of Goods | Manganese Ore |
| Grade | Ultra Low (Below 32%) |
| Size | 20-50MM ( 98% Min ) |
| Specifications | Trial loads |
| Quantity | 50 |
| Weight Unit | Metric Tonne |
| Destination | |
| Rate | 1 |
| Currency | Zambian Kwacha |
| VAT % | (not set) |
| Mode/Terms of Payment | |
| Terms of Delivery | |
| Delivery Period | |
| Dispatch Through | |
| Lot Number | Robbie Evans Kapiri LG ore |
| Remark | |
| Other Reference(s) | |
|---|
Showing 1-1 of 1 item.
| # | Supply Date | Supplier Name | Item | Grade (%) | Inward Quantity |
| 1 | 21 Sep 2020 | Robbie Evans | Manganese Ore | Ultra Low (Below 32%) | 18.166 |
Total Supply: 18.17