Supply Date26 Mar 2024
Contract NumberSAFAL/P/STEAM COAL/03/2024/16
ItemSteam Coal
Supplier NameTopglory Mining Company Limited
Grade (%)N/A
Lot NumberTOP GLORY MINING LTD. COAL FY 2024
Deviance0
Inward Quantity31.12
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2956.4
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-5 of 5 items.
Raw Material ComponentValue
VM28.00
ASH18.40
FC46.40
MOISTURE3.20
Size 0-10MM1-40mm