Supply Date19 Dec 2023
Contract NumberSAFAL/P/MANGANESE ORE/12/2023/52
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDINGCHENG (CHIKONDE/SAKENI) HIGH GRADE FY 2023
Deviance0
Inward Quantity41.26
Freight25
Loading Charges30
Offloading Charges0.036072457
Royalty2.630375
Other Cost1.459166234
Quality Deviance0
Grade Deviance0
Total Cost5368.98
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.70
Fe2.51
SiO210.39
Al2O33.67
P0.116
Size 0-10MM15.87
Size 10-20MM13.02
Size 20-100MM58.88
Size +100MM12.23
MOISTURE1.82