Supply Date02 Dec 2023
Contract NumberSAFAL/P/MANGANESE ORE/07/2023/4
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDINGCHENG (CHIKONDE/SAKENI) HIGH GRADE FY 2023
Deviance0
Inward Quantity38.32
Freight20.7627118644
Loading Charges18
Offloading Charges0.138372447
Royalty2.775885
Other Cost1.55344668868
Quality Deviance0
Grade Deviance0
Total Cost5143.71
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.10
Fe2.70
SiO211.20
Al2O33.70
P0.116
Size 0-10MM15.90
Size 10-20MM1.89
Size 20-100MM3.85
Size +100MM78.40
MOISTURE1.15