Supply Date28 Nov 2023
Contract NumberSAFAL/P/MANGANESE ORE/07/2023/4
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDINGCHENG (CHIKONDE/SAKENI) HIGH GRADE FY 2023
Deviance0
Inward Quantity44.88
Freight20.9401709401
Loading Charges18
Offloading Charges0.040246473
Royalty2.62986133679
Other Cost1.41663125088
Quality Deviance0
Grade Deviance0
Total Cost6015.13
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.09
Fe2.68
SiO210.31
Al2O33.65
P0.116
Size 0-10MM11.35
Size 10-20MM12.31
Size 20-100MM59.81
Size +100MM16.53
MOISTURE1.78