SAFAL/P/MN ORE/09.76/2020
| Contract Number | SAFAL/P/MN ORE/09.76/2020 |
| Contract Date | 01 Sep 2020 |
| Type | Purchase |
| Supplier Name | Peniel Mines Limited |
| Description of Goods | Manganese Ore |
| Grade | Low (32% - 38%) |
| Size | 10- 60 MM (90%Min) |
| Specifications | Mn- Min 35% |
| Quantity | 100 |
| Weight Unit | Metric Tonne |
| Destination | SAFAL, Kanona |
| Rate | 150 |
| Currency | Zambian Kwacha |
| VAT % | 16 |
| Mode/Terms of Payment | 100% after dispatch and testing at SAFAL lab |
| Terms of Delivery | Ex Mine loaded on trucks with documents - MRT INCLUSIVE |
| Delivery Period | September 2020 |
| Dispatch Through | Buyer hired trucks |
| Lot Number | Peniel Mining - Mn ore 35-38% |
| Remark | |
| Other Reference(s) | |
|---|
Showing 1-2 of 2 items.
| # | Supply Date | Supplier Name | Item | Grade (%) | Inward Quantity |
| 1 | 06 Sep 2020 | Peniel Mines Limited | Manganese Ore | Low (32% - 38%) | 31.475 |
| 2 | 09 Sep 2020 | Peniel Mines Limited | Manganese Ore | Low (32% - 38%) | 32.46 |
Total Supply: 63.93