Supply Date11 Aug 2023
Contract NumberSAFAL/P/IRON ORE/08/2023/29
ItemIron Ore
Supplier NameAlex siulemba
Grade (%)N/A
Lot NumberALEX SILUMBA IRON ORE FY 2023
Deviance0
Inward Quantity35.56
Freight20.8482093994
Loading Charges0
Offloading Charges0
Royalty0.83392837597
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1364.11
Conversion Rate (Please insert 1 if no conversion is required)19.1863
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe67.25
Mn-
SiO24.15
Al2O32.20
P0.124
Size 0-10MM+100=89%