Supply Date10 Aug 2023
Contract NumberSAFAL/P/IRON ORE/08/2023/29
ItemIron Ore
Supplier NameAlex siulemba
Grade (%)N/A
Lot NumberALEX SILUMBA IRON ORE FY 2023
Deviance0
Inward Quantity52.1
Freight20.8482093994
Loading Charges0
Offloading Charges0
Royalty0.83392837597
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1998.59
Conversion Rate (Please insert 1 if no conversion is required)19.1863
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe66.9
Mn-
SiO25.12
Al2O32.67
P0.125
Size 0-10MM10-200mm