Raw Material Inward
| Supply Date | 10 Aug 2023 |
|---|---|
| Contract Number | SAFAL/P/MANGANESE ORE/08/2023/36 |
| Item | Manganese Ore |
| Supplier Name | Gamcore Zambia Limited |
| Grade (%) | High (44% - 50%) |
| Lot Number | Gamcore Mn ore FY 23 |
| Deviance | 0 |
| Inward Quantity | 34.7 |
| Freight | 23.8600212089 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 5.357 |
| Other Cost | 0.17031700288 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 4350.94 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |