Raw Material Inward
| Supply Date | 01 Aug 2023 |
|---|---|
| Contract Number | SAFAL/P/MANGANESE ORE/07/2023/6 |
| Item | Manganese Ore |
| Supplier Name | Gamcore Zambia Limited |
| Grade (%) | High (44% - 50%) |
| Lot Number | Gamcore Mn ore FY 23 |
| Deviance | 0 |
| Inward Quantity | 29.24 |
| Freight | 23.8095238095 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 6.132 |
| Other Cost | 0.18160054719 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 3541.64 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |