Supply Date23 Jul 2023
Contract NumberSAFAL/P/MANGANESE ORE/06/2023/19
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDINCHENG MN ORE FY 2023
Deviance0
Inward Quantity15.84
Freight0
Loading Charges0
Offloading Charges0
Royalty4.23
Other Cost0.00315656565
Quality Deviance0
Grade Deviance0
Total Cost1270.89
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.65
Fe3.65
SiO216.48
Al2O36.57
P0.160
Size 0-10MM12.68
Size 10-20MM15.95
Size 20-100MM67.17
Size +100MM4.20
MOISTURE3.75