Supply Date21 Jul 2023
Contract NumberSAFAL/P/MANGANESE ORE/06/2023/19
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDINCHENG MN ORE FY 2023
Deviance0
Inward Quantity17.3
Freight0
Loading Charges0
Offloading Charges0
Royalty4.06
Other Cost0.00346820809
Quality Deviance0
Grade Deviance0
Total Cost1385.1
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.85
Fe4.25
SiO216.45
Al2O36.80
P0.165
Size 0-10MM16.45
Size 10-20MM15.60
Size 20-100MM66.85
Size +100MM1.10
MOISTURE4.20