Supply Date20 Jul 2023
Contract NumberSAFAL/P/MANGANESE ORE/06/2023/19
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDINCHENG MN ORE FY 2023
Deviance0
Inward Quantity18.26
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1387.76
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.38
Fe4.25
SiO216.10
Al2O36.75
P0.166
Size 0-10MM15.15
Size 10-20MM19.20
Size 20-100MM65.65
Size +100MM-
MOISTURE4.55