Supply Date06 Jul 2023
Contract NumberSAFAL/P/MANGANESE ORE/05/2023/1
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDINCHENG MN ORE FY 2023
Deviance0
Inward Quantity39.18
Freight12.0689655172
Loading Charges0
Offloading Charges0
Royalty4.36
Other Cost-0.00025523226
Quality Deviance0
Grade Deviance0
Total Cost3621.36
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.24
Fe3.1
SiO215.9
Al2O34.55
P0.17
Size 0-10MM7.71
Size 10-20MM15.61
Size 20-100MM56.58
Size +100MM20.1
MOISTURE3.81