Supply Date19 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity28.1
Freight13.24
Loading Charges-7.013879004
Offloading Charges3.0044
Royalty5.11
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2538.57
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.10
Fe3.60
SiO214.10
Al2O34.25
P0.170
Size 0-10MM6.10
Size 10-20MM3.50
Size 20-100MM79.80
Size +100MM10.60
MOISTURE3.95