Supply Date10 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity20.82
Freight0
Loading Charges-6.715177714
Offloading Charges2.78
Royalty5.21
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1608.86
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.5
Fe3.16
SiO216.15
Al2O34.25
P0.149
Size 0-10MM2.9
Size 10-20MM5.6
Size 20-100MM71.38
Size +100MM20.12
MOISTURE2.88