Supply Date06 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity20.88
Freight0
Loading Charges-7
Offloading Charges2.78
Royalty5.25
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1608.39
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.66
Fe3.95
SiO214.60
Al2O34.80
P0.16
Size 0-10MM2.10
Size 10-20MM4.60
Size 20-100MM83.29
Size +100MM10.01
MOISTURE3.81