Supply Date12 Oct 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance
Inward Quantity35.8
Freight32.01
Loading Charges-5
Offloading Charges-0.603631285
Royalty7.43
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5006.14
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.1
Fe3.75
SiO211.24
Al2O32.75
P0.13
Size 0-10MM1.15
Size 10-20MM1.28
Size 20-100MM49.55
Size +100MM48.02
MOISTURE0.92