Supply Date07 Oct 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity40.24
Freight17.87
Loading Charges0
Offloading Charges0.872017893
Royalty5.5
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4033.74
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.10
Fe3.95
SiO211.66
Al2O32.79
P0.145
Size 0-10MM3.10
Size 10-20MM5.90
Size 20-100MM91.00
Size +100MM0
MOISTURE2.60