Supply Date06 Oct 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity22.78
Freight0
Loading Charges0.88
Offloading Charges-0.003072871
Royalty5.5
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1876.55
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.78
Fe3.75
SiO210.98
Al2O35.68
P0.149
Size 0-10MM7.65
Size 10-20MM11.68
Size 20-100MM80.67
Size +100MM0
MOISTURE6.84