Supply Date04 Oct 2022
Contract NumberSAFAL/P/MN ORE/08.02/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity42.98
Freight28.81
Loading Charges0
Offloading Charges3.795253606
Royalty7.29
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost7130.18
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.05
Fe2.40
SiO211.65
Al2O32.98
P0.124
Size 0-10MM0.82
Size 10-20MM1.01
Size 20-100MM27.68
Size +100MM70.49
MOISTURE0.55