Supply Date03 Oct 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity29.76
Freight32.01
Loading Charges19.1999328
Offloading Charges0.9586
Royalty4.19
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4236.59
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.12
Fe6.84
SiO215.94
Al2O37.20
P0.127
Size 0-10MM3.54
Size 10-20MM2.75
Size 20-100MM66.61
Size +100MM27.10
MOISTURE1.10